NeuraChainSolutions
NeuraChain Method · Phase 3 of 5 · Engineering & value

Factory layout and material flow redesign

What we do. We trace how parts actually move, redesign the floor into cells in routing order, balance work with one-operator-two-machine (1M2S) cells, and take cost out of the top parts with DFM and preventive maintenance.

T+00:00
Engineering service figure: an engineer with a layout blueprint beside a robot-arm buddy
Service 03 · Engineering
Engineering & Value Optimization
“Redesign the factory floor for maximum throughput.”
Layout redesign1M2S cellsDFM reviewPM program
Next phase: Smart Factory →
Floor plan · machining part family
8 machines · 1 routing · sample plant data
Functional layout · machines grouped by typepart flow operator
MAIN AISLE FREED4,800 sq ft 1 operator · 2 lathes
Engineering changes
    DFM review · bracket BR-204
    Setups6
    Cycle time14.2 min
    Cost / unit$18.40
    Impact

    Shorter flow, freed floor space and lower cost per part, before any new equipment is bought.

    Illustrative simulation with sample data. The export button previews the deliverable.Privacy Policy · ← Back to all services